#10

Route ALL returns as they are being worked on.

  • Once the return is ready to be finalized, be sure to include the delivery preference and assembly notes in Go File Room prior to routing to assembly.

#9

Use the fillable Finalizing Sheet/Green Sheet and put it in Caseware prior to bringing it up front.

  • Print a copy of it and put on top of the return prior to placing in assembly drawers.
  • If the return is part of a group and the Caseware file is not self-explanatory, please make a note of that in Go File Room and/or on the printed out Green Sheet.

#8

Notify adminteam@waldronrand.com of any client address changes since the last time the return was prepared.

  • Additionally, make sure that we are notified if the mailing address is different than on the return

#7

Make sure the PIC/SIC is signed off on the Green Sheet/Finalizing Instructions Sheet

#6

Put Clear and Concise Instructions on the Green Sheet/Finalizing Instructions Sheet

  • Make sure all states are included
  • Make sure ALL manual returns/forms are listed (anything that has its own transmittal/instructions page
  • Choose just 1 delivery option (i.e. Mail, Safesend, Pickup)

#5

Give as much notice as possible for returns that have a high priority

#4

Complete the proper checklists (1040/corporate) and make sure they are in Caseware (replace the placeholder) prior to bringing it up front.

#3

Export FBARS, IT 204LL, CT returns, etc. separately from the actual return.

  • Be sure that there is a matching workflow and that is routed properly to assembly.

#2

Explain Safesend to your clients so that they know that they can sign and download the returns to PDF.

  • (The letter that is typically sent to clients is saved under files in the Waldron Rand Team)

#1

IF THERE IS ANYTHING WE CAN DO TO HELP WITH THESE PROCEDURES, PLEASE LET US KNOW!